Layout Work

Layout Work

etting out (or staking out) using a total station is a modern surveying process used to transfer design data (like coordinates or levels from plans) onto the ground for construction. It’s commonly used in civil engineering and construction projects like roads, buildings, bridges, etc.

Here’s a clear and structured description of the process:

🔧 What is Setting Out?

Setting out is the process of marking the exact positions and levels of construction elements (like foundations, walls, roads) on the ground based on design drawings or coordinates.

📡 What is a Total Station?

A total station is an electronic/optical instrument used in modern surveying. It combines:

  • Electronic theodolite (for measuring angles),
  • Electronic distance meter (EDM) (for measuring distances),
  • Microprocessor and data storage (for calculations and recording),
  • Often includes GNSS, laser, and prism capabilities.

📍 Steps in Setting Out Using a Total Station:

  1. Preparation:
    Import the design coordinates (e.g., from AutoCAD or CSV format) into the total station.
    Set up control points on the site that are referenced from a known datum.
  2. Instrument Setup:
    Set up the total station over a known point or reference mark.
    Level and calibrate the instrument.
    Input the station’s coordinates and orientation (back-sighting another known point).

Send a Message

An email will be sent to the owner